In connection with construction starts on the parking deck outside the eighth floor of the Laboratory Building, the entrance on the eighth floor is closed for regular access. The exit is however still the escape route for the eighth and ninth floors, and will be opened automatically upon evacuation. An emergency door opener has been installed.
New mustering place is at the parking lot by Ulriksbanen.