On Thursday August 14, the network in the lab-building will be unavailable in periods between 6 am and 8 am due to replacement and upgrade of network-switcher.
The work will begin on floors 1-2-3 at 6 am, then floors 4-5-6, and finally there will be a new shut down off the network for one of the four switches serving floors 7-8-9 for installment of the correct part.
This last task will affect the same systems which suffered the longest shut down last time. All work will be completed by 8 am.